Migration Center — the assessment platform, its three collection methods, and the six outputs an estimate can actually use

Google Cloud's own assessment tool, and the reason the owner's use case has a first-party starting point. What it does, the three ways assets get into it, and the outputs — inventory with performance metrics, TCO, network dependencies, risk and product recommendations — that an estimate consumes directly.

markdownreferencev1CCZQ-TM58stage: designtrust: officialfamily: migrationservice: migration-centerinterface: anymigration centerasset discoverydiscovery clientagentlessassessmenttotal cost of ownershipTCOnetwork dependenciesmigration wave planningpreference setgroupsrisk assessment

Created 21 Oct 2026 · Modified 23 Oct 2026 · 1 version

Migration Center

1. What it is

"A unified platform that helps you accelerate your end-to-end cloud journey from your current on-premises or other cloud environments to Google Cloud."

"Or other cloud environments" is the clause that matters here. This is not an on-premises-only tool, which makes it the first-party starting point for exactly the cross-cloud work this hub's parity guides serve.

2. Three ways to get assets in

MethodWhen
discovery client installedcontinuous, detailed collection including performance metrics
manual uploadyou already have an inventory from somewhere else
agentless scanning via CLI toolsa one-time export, when you cannot install anything

The agentless path is the one that unblocks an assessment in a political environment: no agent, no change window, one export.

3. What it does

  • cost estimation, in two depths: rapid estimates and detailed assessments;
  • asset discovery and inventory;
  • infrastructure assessment with technical fit analysis;
  • total cost of ownership (TCO) reporting;
  • network dependency identification;
  • grouping of assets, and migration preference configuration;
  • migration wave planning with risk assessment.

4. The outputs, and which of them an estimate consumes

OutputWhat an estimate does with it
asset inventory with performance metricsthe sizing input. This is the one that matters most — it is measured utilisation rather than provisioned capacity, which is how right-sizing stops being a guess
cloud cost projections and TCO reportsthe cost line, under preference sets you chose
network dependency visualisationsthe wave boundaries. Two systems that talk to each other move together, or you pay for the traffic between them crossing clouds mid-migration
risk assessments with mitigation strategiesthe contingency
product recommendationsa starting mapping, to be checked against the parity guides
groups and preference setsthe model you re-run the assessment under

Network dependencies are the most under-used output. A wave plan built from application ownership rather than from measured traffic is the commonest reason a migration incurs unplanned egress — which is frequently the single largest unexpected cost in the whole project (guides/parity-and-migration-method.md).

5. How to use it with this hub

Migration Center answers "what have I got, and roughly what will it cost on Google Cloud". It does not answer "what changes, and what work does that imply" — that is what the ten parity guides are for.

The intended sequence, set out in full in guides/parity-and-migration-method.md:

  1. inventory and measure — Migration Center, or the source cloud's equivalent;
  2. map — the parity guide per family, for counterpart names;
  3. price the differences — the estimate-bearing rows in each parity guide;
  4. sequence — waves from the network dependency graph;
  5. move — the migration family's execution services

(reference/migration/migrate-to-virtual-machines.md, reference/migration/database-migration-service.md, reference/migration/storage-transfer-service.md).

A rapid estimate is enough for step 3's first pass; a detailed assessment is what you want before committing to a number anybody will be held to.

Read this document as markdown — the same bytes an agent receives.